DA vs CDC in NSW: Cost, Timeline & Which Is Cheaper — NSW Building Approval Costs & Requirements
DA vs CDC in NSW

DA vs CDC: cost, timeline & which is cheaper

The approval pathway you take decides how much you pay and how long you wait. A CDC is usually the cheaper, faster route — but not every project qualifies. Here's how they compare, and how to find out which one your property is eligible for.

Check your property's pathway →
CDC (Complying Development)DA (Development Application)
Typical cost$3,000–$8,000$5,000–$25,000+
Timeline~10–20 days40–90+ days
Assessed byPrivate certifierCouncil
Advertising / notificationNoneUsually required
Developer contributionsRare / smallerOften apply (s7.11/7.12)
Available whenProject meets the CDC codesAnything that doesn't

So which is cheaper?

A CDC is almost always the cheaper and faster path — it skips council assessment, public advertising and (usually) developer contributions. But you can only use it if your project fits the NSW Complying Development codes for your zone: setbacks, height, floor space ratio, and overlays like flood, bushfire or heritage. Miss any of those and you're into DA territory — with the extra cost and months of assessment that come with it.

The catch: whether you qualify depends entirely on your address — its zone, its overlays, and the exact work you're doing. A generic answer won't tell you which pathway (and which bill) applies to you.

Find out which pathway your property qualifies for

Enter your address — we'll check your zone, overlays and project type, tell you whether it's CDC or DA, and itemise the full cost either way. $39 for the complete report.

See your pathway & costs →

Frequently asked questions

Is a CDC cheaper than a DA?

Usually — $3k–$8k for a CDC vs $5k–$25k+ for a DA, and ~10–20 days vs 40–90+. The DA adds council assessment, advertising and often contributions.

How do I know if I qualify for a CDC?

Your project must meet the Complying Development codes for your zone — setbacks, height, FSR, and overlays. If it doesn't, a DA is required. It's property-specific, which is why an address check is the only way to be sure.

Can the same certifier do my CDC and be my Principal Certifier?

Yes, and they often do — but they're two separate appointments. You can't start work until the CDC is issued and a Principal Certifier is formally appointed.