Granny flat approval cost in NSW
A granny flat (secondary dwelling) is one of the cheapest ways to add value or rental income — but the approval isn't free. Between certifier fees, contributions, the levy and consultant reports, expect $3,000–$10,000+ before you build. Whether you qualify for the cheaper CDC path depends on your block. Here's how to find out for your address.
Check your block →Does your block qualify for the fast (CDC) path?
Under the NSW Housing SEPP, a granny flat can usually be approved as Complying Development — a ~10–20 day certifier approval — if the block ticks these boxes:
- Minimum lot size 450m²
- Max 60m² of living area for the secondary dwelling
- Setback, height and site coverage within the code for your zone
- No disqualifying overlays — flood, bushfire or heritage can push you to a DA
Miss any of these and it's a council Development Application instead — slower and more expensive. The only way to know which applies is to check your specific block's zone, size and overlays.
What the approval actually costs
- CDC or DA fee — $3,000–$8,000 (CDC) or more via a DA.
- NSW planning portal & reform fee — state service fees on the application.
- Developer contributions — some councils levy s7.11/7.12 contributions on a new dwelling.
- Consultant reports — BASIX, engineering, stormwater and a site/waste plan.
- Bonds — some councils require a refundable damage/stormwater bond.
See your granny flat's exact approval costs
Enter your address — we'll check whether your block qualifies for CDC, and itemise every fee, contribution, report and bond for a secondary dwelling on your property. $39 for the full report.
Check my block →Frequently asked questions
How much does granny flat approval cost in NSW?
Typically $3,000–$10,000+ all-in for the approval — certifier/council fee, portal fees, any contributions, and consultant reports. The CDC path is cheaper than a DA when your block qualifies.
Can any block have a granny flat?
No. You generally need at least 450m² and to meet the setback and size rules. Flood, bushfire or heritage overlays can rule out the fast CDC path or require extra work.
How long does approval take?
A CDC is usually ~10–20 days via a private certifier; a DA to council is typically 40–90+ days.